Minister of Aviation and Aerospace Development, Festus Keyamo, has defended the federal government’s decision to invest N712 billion in renovating Murtala Muhammed International Airport (MMIA), Lagos, calling it a much-needed overhaul to match global standards.
In a detailed post on his verified X account on Sunday, Keyamo explained that the Federal Executive Council (FEC) recently approved the full rehabilitation of Terminal One, the older terminal built in 1979.
“It’s structurally worn out. We’re stripping it down to its carcass—roof included—and rebuilding it from scratch,” Keyamo said. Both Wings D and E will be affected by the reconstruction.
The newer Terminal Two—built with a Chinese loan and opened under President Tinubu’s administration—will also be expanded. The apron will be enlarged to accommodate wide-body aircraft.
To solve the notorious traffic bottleneck at the airport, Keyamo announced two new independent ring roads: one for arrivals and one for departures. A new bridge will also connect directly to Terminal Two’s upper-level departure lounge, eliminating the current escalator bottleneck.
Smart technology and upgraded passenger services will be part of the revamp, aimed at transforming MMIA into a world-class facility.
Keyamo emphasized that the entire project will be funded through the Renewed Hope Infrastructure Development Fund—sourced from fuel subsidy savings—with no external loans.
He also promised transparency: “Journalists, CSOs, lawmakers, and concerned Nigerians will be invited to inspect the site periodically.”






