The Commissioner for Works, Anambra State, Engr Marcel Ifejiofor has stated that the administration of Gov Willie Obiano inherited 96 road projects and has completed 54.
Ifejiofor who disclosed that the roads were inherited from Gov Obiano’s predecessor, noted that the remaining 42 were at various stages of completion.
Engr Ifejiofor revealed this while addressing journalists over the weekend.
Engr. Ifejiofor while detailing the roads inherited and completed by the administration noted that the Governor inaugurated Design Review Committee to check erosion on our roads which occur due to improper discharge of floodwater.
“Governor Obiano does not want to leave any project uncompleted anywhere in the state.
“Despite the economic downturn in the country which was followed by coronavirus pandemic, EndSARS and back to covid19 again, the governor has continued to push for the completion of all these projects.”
“The Government inaugurated DESIGN REVIEW COMMITTEE because it discovered that Anambra is the most erosion ravaged the state in Nigeria with about 1000 active erosion sites and some of these gullies form because of poor discharge of floodwater from road construction sites.
“We redesigned most of the inherited road projects so as to meet modern designs and avert the issue of erosion”.
Engr. Ifejiofor mentioned some of the completed road projects like Ekwulobia – Ezinifite, Ifite Nteje – Umunya Road with Bridge, Ekwulobia – Umunze – Umuchu bypass, SARS Awkuzu – Nando road, Igboukwu – Ekwulummili road among others.
Further speaking, the Commissioner noted that Nzam, Anambra West is the only Local Government Headquarters in Nigeria that does not have even a kilometer of tarred road but expressed happiness that the government is taking road to that part of the sate.
Said he, “Nzam is the only Local Government headquarters in Nigeria without a tarred road. We are presently building one there. We have completed the Mmiata bridge and very soon, we will get to Nzam. The terrain is very tough but we are doing it.
“Onono Community, the major producer of the vegetables we consume here and export has no road. We are taking tarred road to that place.
“The sand fill measures about 10meters high. These communities before now only access their villages through Asaba, Delta State but the story is not the same now.”
” Ogwuaniocha in Ogbaru and Aguleri Otu in Anambra East Local Government Areas are the oil-producing communities of the state but had no road before now. We are building roads in these areas. Obiano is taking development to the hinterlands”, he concluded.






