BY PETER USMAN
The Minister of Works, Senator David Umahi, has come down hard on China Civil Engineering Construction Company (CCECC) for what he described as poor-quality work on the 43-kilometre Aba–Port Harcourt highway.
Speaking through his Senior Special Assistant on Media, Orji Uchenna, in a statement on Monday, Umahi said the firm had repeatedly ignored warnings to fix defective sections of the road, particularly the Port Harcourt end, which he said had “almost totally failed” less than two years after completion.
As a result, the minister directed that a 14-day termination notice be issued to CCECC and ordered that the Port Harcourt section of the project be descoped and re-awarded to a more competent indigenous contractor.
“If you get to the Port Harcourt end, which they did about two years ago, the entire road has almost totally failed,” Umahi said. “We have written them several times to maintain this road; they refused. So, I have to take responsibility and make a decision.”
He continued: “The Port Harcourt-bound lane is descoped. CCECC will no longer handle it. I’m directing the Ministry to identify qualified indigenous contractors to take over that portion immediately while we source funds for the job.
“For the section still under CCECC, they’re to receive a 14-day termination notice. Within that period, they must mill out the defective binder and replace it properly at their own cost. Failure to do so will lead to termination.”
Umahi emphasized that applying binder without wearing course was unacceptable, stressing that contractors must deliver roads that stand the test of time.
In contrast, he commended Arab Contractors Nigeria Limited for their excellent performance on the 56-kilometre Enugu–Port Harcourt Dual Carriageway (Section II: Umuahia Tower–Aba Rail/Road Crossing), now 85 percent completed.
“They’re among our top five contractors,” he noted. “They’ve done very well, and we want them to maintain the completed section from Aba to Umuahia.”
Umahi also instructed the Federal Controller of Works in Abia State to inspect all federal projects in the state weekly to ensure prompt intervention where challenges arise.
Reflecting on the state of Nigeria’s inherited road infrastructure, the minister commended President Bola Ahmed Tinubu for prioritising nationwide rehabilitation.
“In Nigeria, all roads became a priority because of the terrible situation the President inherited,” Umahi said. “But he’s giving us full support. Roads and bridges are the backbone of economic growth. We’re already seeing results—Nigeria is now ranked among the top three fastest-growing economies in the world.”






